Winfarm in Zaragoza, Spain
Power Production
Stake with Enel Green Power
Project life from COD
of CO2 will be saved from being transmitted into the atmosphere
Winfarm in Zaragoza, Spain
Power Production
Stake with Enel Green Power
Project life from COD
of CO2 will be saved from being transmitted into the atmosphere
Iberia Windfarm
PPA, of which 7 years is remaining
in Partnership with Exus Management Partners
COD
■ We acquired a 49% stake in a 24MW Wind power plant in Zaragoza, Spain towards the end of 2021 from Enel Green Power. The asset has an EV of €35mm with 25 years of life left (COD 2020). ■ The plant is connected to the grid in the areas of Borja and Fréscano, in the province of Zaragoza (merchant pricing). ■ The San Francisco de Borja wind farm consists of seven turbines: five of them with a unit capacity of 3.4 MW, while the other two have a 3.3 MW unit capacity. The wind farm will generate 92.5 GWh annually and will avoid the emission into the atmosphere of 61,270 tons of CO2 per year.
Continuing our relationship with Enel Green Power, we acquired an additional 49% stake in a second 24MW wind-farm project in Frescano, Mallen, Zaragoza, Spain. The Project’s is built and managed by Enel and achieved COD in November 2019. The Asset has an EV of €40mm and 24 years of life. The Plant consists of eight turbines with each of them having 3.3MW unit capacity. We expect the plant to generate around 97 GWh annually which is enough to supply energy to some 24,500 families and avoid the annual emission of some 63,500 tons of CO2 into the atmosphere.
2 Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Consectetur purus ut faucibus pulvinar. Ultricies leo integer malesuada nunc vel risus commodo viverra. Sagittis id consectetur purus ut faucibus pulvinar elementum. Justo eget magna fermentum iaculis eu non. Sociis natoque penatibus et magnis dis parturient montes. Donec ac odio tempor orci dapibus.
■ We acquired a 65% stake in an 8MW windfarm in Portugal in partnership with Exus in 2021. The project’s fully operational since 2012 with a historic 9 years of low operational volatility and strong cash flow generation. ■The Project is composed of 4 turbines Gamesa G97 of which Exus was managing for 5 years prior to the joint acquisition. The Project enjoys regulatory revenues scheme for a 15 year period starting from COD. ■ Exus is also the technical manager for the asset and draws on its wide-ranging expertise to help its investors optimize technical performance, reduce financial risks and ensure long-term revenue certainty.
3 Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna
Projects
MW
Pipeline
Gold production by 2024
Countries
Developing mines